Epoxy Flooring in Spartanburg

Epoxy Floor Installers in Spartanburg

Apex installs epoxy garage floors across Spartanburg County — our own crews, a written 25-year warranty, and most homes finished in a day. Upstate red clay and winter freeze-thaw decide the prep.

Limited-Time Offer
2-Car Garage$2,300
3-Car Garage$2,700
Call (904) 595-9792
✦ FREE ESTIMATE
Free Spartanburg Quote

The estimate's free, runs about half an hour, and right now takes $200 off a 2-car or $300 off a 3-car. Commercial floors get quoted the same way.

1-Day Epoxy Garage Floor Coating Installation

Spartanburg Garage Floor Coatings & Epoxy Flooring Specialists

From older slab-on-grade garages to newer builds across the Spartanburg area, Apex installs every coating system the Spartanburg area needs.

  • Diamond-grind prep and a 100% solids epoxy or polyaspartic base — never a paint or a thin sealer.
  • The wear layer is a UV-stable aliphatic polyaspartic — hard enough for pallet-jack wheels, and it keeps its color under a bay door that stands open all summer.
  • Commercial floors, residential garages, industrial slabs & concrete patios — all covered.
  • Twenty-five years, written as a document with a real term on it, transferable with the property — installed by our own Spartanburg County crew rather than a sub.

Talk to Apex

(904) 595-9792

Free In-Home Estimates

25 Years of Experience
Why Hire Apex for Your Epoxy Garage Floor

Four Questions Worth Asking Whoever Else Is Bidding Epoxy Floor Coatings

  • 01

    Free Quote

    The price is broken out by line, and the line carrying the most cost is the prep. No countdown, no discount that dies at midnight, and no revision once the trailer arrives.

  • 02

    Diamond-Grind Prep

    Every slab gets opened mechanically before anything goes onto it — diamond tooling under vacuum, down to a CSP 2-3 profile. On the newer supplier buildings west of town that step takes longer than the coating does, because a power-troweled floor still wearing curing compound gives a resin nothing to hold onto.

  • 03

    1-Day Install

    Walk on it in 4 hours. Drive on it in 24. Back to normal by tomorrow.

  • 04

    25-Year Warranty

    Written, transferable, and backed by the local Apex location that installed it.

500+Garage Floors
“I’m so happy with my coating! These folks are wonderful at what they do.”
— RODNEY ARNOLD, Google Review
“Elite level flooring from Apex. They use a commercial grade product that lasts a lifetime.”
— CARTER HALL, Google Review
“Apex Epoxy Flooring did a great job on my basement. The crew was easy to deal with and knew what they were doing. Can’t wait to have them do my garage next.”
— ROBERT LAWSON, Google Review
4.8
Based on 208 Google reviews
Industries We Serve

Apex Epoxy Flooring Services & Coatingsfor Spartanburg garages, homes & businesses.

From a supplier's wash bay off I-85 to a 1920s garage in Converse Heights — hover the industry closest to your floor for the build we would quote. Hover any industry to see the fit.

Color Options

Apex Epoxy Color Chart

Explore our most popular flake, metallic, solid-color and marble finishes. We bring physical samples to every free in-home estimate so you can see them on your slab.

Learn More
Learn More
Learn More
Learn More
Learn More
Apex Signature Color Blends

Apex Flake Epoxy Color Chart

15 standard flake color blends

Autumn Brown flake epoxy floor color
Autumn Brown
Cabin Fever flake epoxy floor color
Cabin Fever
Coyote flake epoxy floor color
Coyote
Creekbed flake epoxy floor color
Creekbed
Domino flake epoxy floor color
Domino
Feather Gray flake epoxy floor color
Feather Gray
Glacier flake epoxy floor color
Glacier
Gravel flake epoxy floor color
Gravel
Nightfall flake epoxy floor color
Nightfall
Orbit flake epoxy floor color
Orbit
Outback flake epoxy floor color
Outback
Safari flake epoxy floor color
Safari
Shoreline flake epoxy floor color
Shoreline
Stargazer flake epoxy floor color
Stargazer
Tidal Wave flake epoxy floor color
Tidal Wave

Produced in the standard 1/4″ chip size — 1/8″ and 1/16″ available by special order. Printed colors may vary slightly from the actual blend.

49 metallic color options

Bright White metallic epoxy floor color
Bright White
Pearl metallic epoxy floor color
Pearl
Oyster metallic epoxy floor color
Oyster
Aluminum metallic epoxy floor color
Aluminum
Smoke Gray metallic epoxy floor color
Smoke Gray
Graphite metallic epoxy floor color
Graphite
Charcoal metallic epoxy floor color
Charcoal
Black Pearl metallic epoxy floor color
Black Pearl
Lemonade metallic epoxy floor color
Lemonade
Olive metallic epoxy floor color
Olive
Lime metallic epoxy floor color
Lime
Apple Green metallic epoxy floor color
Apple Green
Pistachio metallic epoxy floor color
Pistachio
Sea Green metallic epoxy floor color
Sea Green
Winter Green metallic epoxy floor color
Winter Green
Jade metallic epoxy floor color
Jade
Sage Green metallic epoxy floor color
Sage Green
Turquoise metallic epoxy floor color
Turquoise
Peacock metallic epoxy floor color
Peacock
Tea Green metallic epoxy floor color
Tea Green
Dark Emerald metallic epoxy floor color
Dark Emerald
Luster Blue metallic epoxy floor color
Luster Blue
Surf Blue metallic epoxy floor color
Surf Blue
Shimmer Blue metallic epoxy floor color
Shimmer Blue
Electric Blue metallic epoxy floor color
Electric Blue
Cobalt metallic epoxy floor color
Cobalt
Royal Blue metallic epoxy floor color
Royal Blue
Twilight Blue metallic epoxy floor color
Twilight Blue
Sapphire metallic epoxy floor color
Sapphire
Bright Orange metallic epoxy floor color
Bright Orange
Gold Rush metallic epoxy floor color
Gold Rush
Aztec Gold metallic epoxy floor color
Aztec Gold
Marigold metallic epoxy floor color
Marigold
Copper metallic epoxy floor color
Copper
Crimson metallic epoxy floor color
Crimson
Chestnut Brown metallic epoxy floor color
Chestnut Brown
Walnut Brown metallic epoxy floor color
Walnut Brown
Mocha Brown metallic epoxy floor color
Mocha Brown
Bronze metallic epoxy floor color
Bronze
Pink metallic epoxy floor color
Pink
Red Blossom metallic epoxy floor color
Red Blossom
Rose metallic epoxy floor color
Rose
Scarlet metallic epoxy floor color
Scarlet
Cabernet metallic epoxy floor color
Cabernet
Magenta metallic epoxy floor color
Magenta
Merlot metallic epoxy floor color
Merlot
Violet metallic epoxy floor color
Violet
Lavender metallic epoxy floor color
Lavender
Purple metallic epoxy floor color
Purple

Printed colors may vary slightly from the actual finish. Ask for a physical sample.

14 solid color options

Deck Gray
Haze Gray
Light Gray
Skyblue
Safety Green
Safety Blue
Safety Yellow
Safety Orange
Tile Red
Safety Red
Black
White
Sandstone
Taupe

Printed colors may vary slightly from the actual finish. Ask for a physical sample.

8 quartz color blends

Tundra quartz epoxy floor color
Tundra
Ruby Red quartz epoxy floor color
Ruby Red
New Moon quartz epoxy floor color
New Moon
Matrix quartz epoxy floor color
Matrix
Marina Blue quartz epoxy floor color
Marina Blue
Crystal quartz epoxy floor color
Crystal
Clear Water quartz epoxy floor color
Clear Water
Twilight quartz epoxy floor color
Twilight

Printed colors may vary slightly from the actual finish. Ask for a physical sample.

8 marble epoxy designs — plus custom pours

Marble epoxy floor design
 
Marble epoxy floor design
 
Marble epoxy floor design
 
Marble epoxy floor design
 
Marble epoxy floor design
 
Marble epoxy floor design
 
Marble epoxy floor design
 
Marble epoxy floor design
 
Unlimited Color PatternsCustom pours — any look you want

Printed colors may vary slightly from the actual finish. Ask for a physical sample.

Our Garage Floor Coating Process

How We Build a Professionally Installed Epoxy Floor.

Most peeling epoxy floor installations don't fail at the topcoat — Ask for a floor spec on a supplier plant off I-85 and you'll get numbers: mil thickness, surface profile, cure window, how many hours the line is down. Ask for a garage quote and you'll usually get a price and a color. Apex builds both the same way and will show you the same numbers either way. Here's what's actually in the stack, bottom to top.

Build · Exploded View Cross-section of a professionally installed commercial floor coating: prepared concrete, epoxy basecoat, vinyl flake, and polyaspartic topcoat
Ready to see yours? Get a Free Floor Assessment

Built for what this county actually rolls onto concrete: forklifts as often as cars, oil worked deep into mill-era floors, red clay off every boot, and brine coming home on the tires all winter.

01

Prepared Concrete Slabdiamond-ground to CSP-2/3

Your existing slab, mechanically profiled to a Concrete Surface Profile of 2 to 3. Cracks patched. Moisture verified. Every layer above only lasts if this one is right.

02

Pigmented Epoxy Basecoat100% solids, rolled edge-to-edge

A pigmented, self-leveling 100%-solids epoxy rolled wet-on-wet directly onto the diamond-ground slab. Delivers the color depth and the film thickness that separates a real floor from a paint job.

03

Vinyl Flake Broadcasthand-cast to full rejection

Vinyl chip flakes hand-broadcast into the wet basecoat until the surface refuses more. Cured overnight, scraped flat, vacuumed. Color, camouflage, and slip-grip in one.

04

Polyaspartic TopcoatUV-stable, chemical-resistant

Everything a Spartanburg County floor has to survive happens up here. Forklift tires and steel wheels in a warehouse. Red clay off boots and truck treads, which stains open concrete permanently and hoses straight off a sealed one. Road brine tracked in all winter. Tires hot off I-26. The answer is a UV-stable aliphatic polyaspartic — hard, chemical-resistant, and quick enough to cure that a shop is running the next shift and a homeowner parks in twenty-four hours. Twenty-five years, in writing, and it transfers.

From Free Estimate to Final Walk-Through

1

Free Estimate

A free visit — garage or plant floor — ending with a moisture reading, real samples, and one installed price instead of a range.

2

Diamond Grind

We mechanically diamond-grind your slab to the right profile.

3

Application

100% solids epoxy, flake broadcast, and polyaspartic topcoat.

4

Final Walk-Thru

We walk the finished floor with you before we leave.

Ready to book your free estimate?

Nothing's owed for the visit, and most of them end with the installed figure written out before the estimator leaves the property. Commercial floors, warehouse bays and plant slabs get scoped on that same trip. If you'd sooner ask a few things first, (904) 595-9792 is the same number for a two-car garage and for a 40,000-square-foot production floor.

Spartanburg Before & After

Our Epoxy Flooring Project Gallery

Warehouse bays, garages, commercial kitchens, kennels, utility rooms — all our own crews, shot on the job in whatever light the day gave us. Push the gold handle across any image and the concrete we were quoting comes back. Drag the gold handle on any floor to reveal the finished result.

Warehouse Floor after Apex epoxy floor coating in Spartanburg, SCWarehouse Floor before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Warehouse Floor·Industrial·drag to compare
2-Car Garage after Apex epoxy floor coating in Spartanburg, SC2-Car Garage before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
2-Car Garage·Residential·Gray Flake Epoxy·drag to compare
Commercial Kitchen after Apex epoxy floor coating in Spartanburg, SCCommercial Kitchen before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Commercial Kitchen·Commercial·drag to compare
Basement after Apex epoxy floor coating in Spartanburg, SCBasement before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Basement·Residential·Metallic Epoxy·drag to compare
Stadium Concourse after Apex epoxy floor coating in Spartanburg, SCStadium Concourse before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Stadium Concourse·Commercial·drag to compare
Garage, Repaired Slab after Apex epoxy floor coating in Spartanburg, SCGarage, Repaired Slab before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Garage, Repaired Slab·Residential·Flake Epoxy·drag to compare
Veterinary Kennel after Apex epoxy floor coating in Spartanburg, SCVeterinary Kennel before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Veterinary Kennel·Commercial·drag to compare
Basement after Apex epoxy floor coating in Spartanburg, SCBasement before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Basement·Residential·Tan Flake Epoxy·drag to compare
Utility Room after Apex epoxy floor coating in Spartanburg, SCUtility Room before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Utility Room·Commercial·drag to compare
Exterior Walkway after Apex epoxy floor coating in Spartanburg, SCExterior Walkway before Apex epoxy floor coating in Spartanburg, SC
BEFOREAFTER
Exterior Walkway·Commercial·drag to compare
View the Full Gallery
Honest Spartanburg Epoxy Pricing

How Much Does an Apex Floor Actually Cost?

Your price comes down to the finish you choose and the condition of your slab. These are honest, installed starting prices for a typical Spartanburg 2-car and 3-car garage.

FinishStarting Price2-Car (~450 sq ft)3-Car (~650 sq ft)Best For
Solid Epoxy$4per sq ft~$1,800~$2,600Clean, budget-friendly single color
Flake EpoxyMost Popular$6per sq ft$2,700 $2,300$3,900 $2,700Most garages — hides flaws, adds grip
Quartz Epoxy$6per sq ft~$2,700~$3,900Maximum slip resistance & durability
Metallic Epoxy$9per sq ft~$4,050~$5,850High-end, marbled showpiece look

Whatever gets written at the estimate is what gets invoiced. There's no mileage line for a run out to Landrum, Chesnee or Woodruff, and nothing gets added once the crew is on site.

Serving the Greater Spartanburg, SC Area

Epoxy Flooring Near Me

Professional epoxy & garage floor coatings across Spartanburg and the surrounding Spartanburg communities.

Boiling SpringsRoebuckMooreDuncanLymanWellfordStartexInmanChesneeCowpensPacoletWoodruffGreerLandrumCampobelloValley FallsArcadiaGlendaleSaxonReidville
Contact Us Today

Upgrade Your Spartanburg Garage Floor in 1 Day - Free Estimate

Book Your Trusted Spartanburg Epoxy Flooring Contractor - Free Quote

Jacksonville epoxy installation
Free Consultation

Contact us today for a no-cost consultation where we evaluate your flooring needs, provide an estimated price based on square footage, and recommend the best epoxy flooring solutions tailored specifically for you.

concrete coating Jacksonville
Diamond Grinding Floor Prep

We use a diamond propane grinder to meticulously prepare your floor, ensuring a smooth, flawless surface that maximizes the adhesion and longevity of your epoxy floor coating.

garage floor coating
Multi-Layered Epoxy Floor Installation

Our team applies multiple layers of premium epoxy resin flooring, each layer enhancing the durability, aesthetics, and overall performance of your new epoxy floor.

concrete coating company Jacksonville
Curing & Final Inspection

We ensure the epoxy floor coating cures properly to achieve maximum strength and conduct a thorough final inspection to guarantee your complete satisfaction with the finished project.

Polyaspartic vs Epoxy in Spartanburg

The Real Difference — And Our Take

Polyaspartic

Fast & UV-Safe
  • Walk-on in ~4 hours
  • Won’t yellow under UV
  • Resists hot-tire pickup

Epoxy

Thick & Rich
  • Deepest color & film build
  • Most budget-friendly
  • Rock-hard once cured
The Apex Answer

We use both — that's the whole point. Epoxy goes down first because it grips the ground profile and builds the film thickness you're paying for. Aliphatic polyaspartic goes over the top because it holds its color in daylight and takes a car in 24 hours. Run them in that order and neither material has to do the other one's job.

Spartanburg Epoxy FAQs

Answers From Our Epoxy Flooring Professionals

The questions Spartanburg homeowners actually search before coating a garage floor — answered honestly, including the downsides.

For a standard 2-car it's $2,300 installed, and for a 3-car it's $2,700 — those figures cover the whole build and nothing gets added to them later. Most Spartanburg 2-car garages land inside $1,800 to $2,700, with the concrete deciding where. The $5 to $15 per square foot the industry quotes is a prep range dressed up as a product range. You'll leave the free estimate holding one number.
Twenty by twenty works out to 400 square feet, which is a standard 2-car, and on concrete that needs nothing unusual that's the $2,300 installed number. Everything past it is machine hours. A hand-floated Converse Heights bay from the thirties, painted twice since, is a different morning than a Boiling Springs slab poured in 2015 — one has to be cut through, the other has to be opened up. We put those hours on the estimate rather than discovering them with a crew already in the driveway.
The published national numbers — roughly $1,500 to $4,000 installed, $300 to $900 for a shelf kit — are too wide to plan against. Around Spartanburg County the real window is narrower: $1,800 to $2,700 for a full system with machine prep underneath it. A bid well beneath that isn't the same floor at a discount. It's a shorter scope, and the concrete work is what got cut.
Ask each one for a spec, the way a plant purchasing office would. How deep does the slab get profiled, what's the solids content of the basecoat, is the flake broadcast to rejection or scattered, and what goes on top of it. A cheap number usually answers none of that, because it's a wash and a roller. None of those steps can be inspected once the floor's down, and none can be added afterward.
The build, end to end: moisture testing, diamond grinding to a CSP 2 to 3 profile, crack and pit repair, a pigmented 100%-solids epoxy basecoat, vinyl flake broadcast to full rejection, and a UV-stable aliphatic polyaspartic topcoat. The written, transferable 25-year warranty comes with it. Nothing's billed for the drive, whether that's a shop in Duncan or a garage on the east side, and the estimate figure is the invoice figure.
Tile costs more once somebody's labor is counted, and garage grout starts cracking and holding grit inside the first year. Polished concrete is the closer comparison, and it's the finish plenty of warehouses around here already have. It's hard and it's handsome, but polishing works the concrete you already own — it adds no film, no color, no flake texture, and oil still finds its way into the surface.
A professionally built system generally runs a decade to two, and traffic decides where inside that it lands. Two cars is a gentler life than a shop bay taking a floor jack and pallet traffic every day, and we spec accordingly. Our warranty is 25 years, written and transferable — a commitment we'd only put on paper for concrete our own crew opened up first.
Not dramatically different. Gloss softens in the two tracks the tires run, and on a flake floor that's usually the whole list — color holds, because the layer taking the daylight isn't epoxy. For scale, the same build goes down in shop and warehouse bays that take pallet jacks and forklift traffic all week. Two cars parked on it is an easy assignment by comparison.
They're two different verdicts. Blistering says the slab was wet and nobody read it — vapor climbs, meets a sealed surface, and stops there. Peeling says the coating was lying on the concrete instead of keyed into it. Neither one's bad luck, and neither is patchable in any satisfying way, which is why the moisture reading and the grinding both happen before a price gets written.
Epoxy ambers under UV. That's resin behaving as resin does rather than an installer error, and it's why epoxy never ends up as the visible layer on our floors. What sits on top is an aliphatic polyaspartic, which holds its color. Not every polyaspartic does — the aromatic version drifts yellow much the way epoxy would, and a quote that prints only the family name hasn't told you which you're buying.
Yes, on a floor that's keyed in. Epoxy's heat deflection point sits somewhere around 130 to 140 degrees and highway-hot rubber runs above that, so the film softens, the tire grips it, and as the tire cools it contracts and tries to lift what it's holding. Whether it manages that is a bond question. The harder test here isn't a commuter car — it's a work van parking in the same two rectangles every night.
They're stages, not alternatives. Epoxy is what puts real film on concrete and what bites down into a ground profile, though it cures slowly and won't hold color in daylight. Polyaspartic goes off in hours and stays the color you picked, and by itself it leaves almost nothing behind. Stack them with the flake bed in between and you get film thickness and a next-day garage in the same floor.
Depends what the floor has to survive. In a plant bay running hot wash-downs or steel wheels there are systems built for exactly that, and we'd say so. For a garage, nothing has displaced a 100%-solids epoxy body under a polyaspartic wear layer — it's the most bonded film you can get onto concrete for sensible money. The pitch to watch is a one-coat floor: quick to apply, thin once it's dry.
That depends on what rolls across it, which is why there's no single answer. A garage, a fire station apron and a warehouse aisle wear out in different ways. What holds for all three is the same short list: how deep the concrete got opened, how much bonded film ended up in it, and whether the wear layer is hard enough for the traffic. Ours is CSP 2 to 3, 100%-solids epoxy, full flake, aliphatic polyaspartic.
Grinding is the obvious gap, but the step people underestimate is the broadcast. Flake goes into wet epoxy by hand, faster than the basecoat sets, and getting even coverage across 400 square feet takes more than one pair of hands. Kits duck it with a light chip scatter. Add grinder rental, diamond tooling and a lost weekend to the shelf price, then set that beside a quote carrying a 25-year warranty.
Only if what's down is genuinely bonded, and we test that rather than assume it. There's a second question here that doesn't come up everywhere: old shop and mill-building floors are frequently soaked with machine oil well below the surface. Grinding alone doesn't solve that — the concrete needs degreasing first, or the new system bonds to oil. Removal and cleaning each show as their own line on the estimate.
A residential garage is one day, grinder to topcoat. Commercial and industrial slabs get scoped differently — more square footage, more terminations, sometimes coating around equipment that can't be moved — and those commonly run two days or longer. We size it at the estimate and put the day count in writing, because on a working floor the schedule matters as much as the price does.
Four hours to walk, twenty-four before a vehicle comes back in. That turnaround belongs to the polyaspartic; the same floor topped with epoxy alone would keep the bay out of service most of a week. At a house that difference is one night in the driveway. At a shop that bills by the bay, it's often the number that decides whether the job happens at all.
Think in functions rather than a count. A vapor-barrier primer goes first when the moisture reading calls for one. Then a pigmented 100%-solids epoxy basecoat rolled wall to wall, with vinyl flake hand-cast into it while it's still wet and broadcast until the surface won't take another chip. The flake bed gets scraped flat and vacuumed, then a clear aliphatic polyaspartic seals it. Industrial floors get built heavier.
Not much at home. A broom handles most weeks, warm water and a mild cleaner handle the rest, and there's nothing to wax or reseal. Red clay off a driveway rinses away instead of staining, since there's nothing porous left for it to get into. On a commercial floor the routine is an auto-scrubber and a neutral cleaner — strong solvents and anything sharply acidic are what to keep off it.
Yes, and only where the damage is. That spot gets ground back, rebuilt and re-flaked into the surrounding blend, and because chip patterns are irregular there's no line left for the eye to follow. One caution worth stating plainly: a chip is a repair, but an area that's lifting or sounds hollow underfoot is a different conversation, and the useful question there is why the bond let go.
The month isn't really the constraint, since the work happens indoors and polyaspartic cures across a wide range. Two things do move the calendar here. A slab sitting in the forties on a January morning is a genuine scheduling conversation, so we read concrete temperature rather than the forecast. And commercial floors mostly get booked into plant shutdowns and holiday weeks, which fill months ahead.
The case rests on what bare concrete does, not on how it looks. It gives off fine dust every time it's swept, takes oil in permanently, and holds the red clay that rides in on tires. There's a reason plants coat their floors, and it isn't decoration. Sealed, that same slab rinses and dries. All of it hinges on prep — coating concrete nobody opened just buys you the same job again later.
Three, plus one people only think about afterward. Any gloss surface is slick with water on it. Epoxy left in daylight loses its color. A coating over unprepared concrete releases, and removal costs more than the original install did. The fourth is downtime — nothing can sit on the floor during the work, which is trivial at a house and a real planning item at a shop. Flake, an aliphatic topcoat and the grinder answer the first three.
Three cases. A slab pushing moisture up with nothing done about the source — seal that and it blisters. Cracking that's still moving, since a coating follows movement rather than stopping it. And concrete carrying so much absorbed oil that it won't clean up, which we meet in old shop bays and mill buildings more than anywhere else. Saying wait, or saying no, is cheaper for both of us than a floor that fails.
A smooth gloss coat would be. Ours isn't smooth — the flake is broadcast into wet epoxy until the surface stops accepting it, which leaves a texture you feel through a shoe sole. Traction is adjustable rather than fixed, too: wash bays, ramps and commercial kitchens get extra aggregate worked into the topcoat. We'd rather settle that at the estimate than have you discover it in February.
Not on an appraisal — garage work doesn't get valued that way. Where it counts is the walk-through, and this county sees a steady stream of people relocating for work; economic development projects announced in 2021 and 2022 alone accounted for 5,787 new jobs, and the announcements haven't stopped since. Plenty of those buyers decide on a single trip. The 25-year warranty transfers with the house, which is worth a line in the listing.
Both, and commercial work is a bigger share here than in most markets we cover. Manufacturing accounts for about 22% of employment in Spartanburg County, and the automotive supplier and distribution network strung along I-85 and I-26 runs on concrete floors. Service bays, warehouse aisles, wash-down rooms and break areas all take different specs, so we walk the floor and scope it by what it carries.
Often yes, and it's a different job from a garage. The mill villages at Glendale, Clifton, Converse, Arcadia and Saxon left behind concrete that's been worked hard for the better part of a century — oil driven deep into it, patched pours of several ages inside one room, and nothing underneath it in the way of a vapor retarder. We test, degrease and grind before pricing, and sometimes a section needs repair first.
Usually, with more prep than a newer one needs. Garages in the older in-town neighborhoods tend to be detached, poured thin, hand-floated, and finished to drain outward — and some were carports that got enclosed later, so one bay holds two ages of concrete that don't move together. We check that seam, read moisture at the low corner rather than the middle, and price the grinding honestly.
All of it. Spartanburg proper plus Boiling Springs, Roebuck, Saxon, Whitney, Arcadia, Glendale, Fairforest, Valley Falls, Startex, Moore, Wellford, Duncan, Lyman, Reidville, Cowpens, Pacolet, Clifton, Converse, Inman, Inman Mills, Woodruff, Greer, Chesnee, Campobello and Landrum. We also run northeast to Gaffney, which is over in Cherokee County. If your road isn't on that list, call (904) 595-9792 and ask.
Customer Reviews

Apex Reviews From the Spartanburg area

5Based on 208 Google reviews across all our locations
SSuzanne Doblera week ago

Blake and his crew did a great job of preparing our previously coated floor by diamond grinding it, vacuuming it and then applying their epoxy with flakes and non slip top coat. Our garage floor was transformed. The crew was friendly and communication on all aspects of the job was top notch.

KKaren Garcia6 months ago

What a great experience working with Apex Epoxy Flooring! The team was professional, punctual, detailed, and gave me great advice for maintaing the floor. My 20x22 sqft garage floor has never looked so good.

CCarter Hall7 months ago

Elite level flooring from Apex. They use a commercial grade product that lasts a lifetime.

EEdith Hart8 months ago

Apex's suggestion to go with epoxy instead of floor paint when I first called them for info was spot on. We’re really happy with how our basement floor turned out and the fact that it is safe if it floods agian. Big thanks to Apex for a fabulous job!

RRobert Lawson8 months ago

Apex Epoxy Flooring did a great job on my basement. The crew was easy to deal with and knew what they were doing. Can’t wait to have them do my garage next.

AAndrew Cliffhinger9 months ago

Apex Epoxy Flooring of Spartanburg gave my two car garage a flake epoxy floor for a very decent price. Their deal on the 2 car garage is well worth the product they use. If you need epoxy work around Spartanburg, Apex is the way to go.

Latest News

Apex Epoxy Flooring Blog

Limited-Time Offer
2-Car Garage$2,300
3-Car Garage$2,700
Call (904) 595-9792
Copyright © 2026 Apex Flooring, LLC, All Rights Reserved.

3 Car Garage Flooring for Just $2700

For just $2,700, give your 3-car garage a professional epoxy flooring finish backed by our lifetime warranty. Fill out this form below to take advantage of this limited time offer!

2 Car Garage floors for Just $2300

For just $2,300, give your 2-car garage a professional epoxy flooring finish backed by our lifetime warranty. Fill out this form below to take advantage of this limited time offer!

3 Car Garage Flooring for Just $2700

For just $2,700, give your 3-car garage a professional epoxy flooring finish backed by our lifetime warranty. Fill out this form below to take advantage of this limited time offer!

2 Car Garage floors for Just $2300

For just $2,300, give your 2-car garage a professional epoxy flooring finish backed by our lifetime warranty. Fill out this form below to take advantage of this limited time offer!

Get Started Now

Ready to upgrade your garage with Apex Epoxy Flooring? Fill out the form below, and let us handle the rest. Whether it’s a 2-car or 3-car garage, we’re here to deliver top-notch service.